Well we are 3 1/2 weeks into our basement project and things are moving right along. This past week they finished the rough plumbing and electrical and passed the inspection for both of those. They also hung the dry wall and passed an inspection for that as well!! It looks so much different down there now that we have walls! This coming week they will be finishing up the carpentry (installing doors and baseboards) and I think installing the bathroom vanity and toilet and possibly tile. I has been fun watching the transformation!! Here are some pics of the space with walls.